Benefits
- Cost-Effective
- Energy-efficient
- Proven Performance
A one-stop shop for HAA5 removal
USG Water Solutions offers a complete, turnkey solution, including design, engineering, equipment selection and installation by trusted tank specialists.
Challenges
-
-
- Compliance
EPA’s Stage 1 and Stage 2 rules establish maximum allowable levels of DBPs in drinking water. - Cost
Alternatives to DBP removal— eliminating organics from upstream processing—can be costly. - Water quality
Long-term consumption of DBPs may increase health risks, according to EPA.
- Compliance
-
Â